• Concept
  • Final Photos

연희동292 House

  • Design phase 2022.02 - 2022.08
  • Construction phase 2022.09 - 2023.01
  • Location Seoul, South Korea
  • Program private house
  • Status completed
  • Site area 138.65 m2
  • Built area 79.81 m2
  • Total floor area 252.39 m2
  • Number of floors B1, 4floors
  • Structure reinforced concrete structure
  • Architect in charged Won Youmin, Jo Janghee
  • Schematic design Lim Kyumin
  • Drawing development Lim Kyumin
  • Interior design Lim Kyumin
  • Technical drawing Lim Kyumin
  • Supervision Lim Kyumin
  • Photographer Won Youmin
  • Structure engineering 중앙탑
  • m.e.p engineering Jungyeon
  • Construction 김종철 실장
닫기
닫기
검색 닫기