양재 cafe토다 Lab
- Design phase 2020.07 -
- Location Seoul, South Korea
- Program coffee Lab
- Status under construction
- Site area 516.00 m2
- Built area 250.05 m2
- Total floor area 432.53 m2
- Number of floors B1, 1floor
- Architect in charged Won Youmin, Jo Janghee
- Schematic design Lim Kyumin
- Drawing development Lim Kyumin
- Interior design Lim Kyumin
- Technical drawing Lim Kyumin, Kang Jongsu
- Supervision Lim Kyumin
- 3D Visualization JYA-RCHITECTS (Lim Kyumin)