목포 옥암동 House
- Design phase 2014.01 - 2014.09
- Construction phase 2014.10 - 2015.03
- Location Moppo-si, Jeonnam, South Korea
- Program private house
- Status completed
- Site area 239.2 m2
- Built area 86.56 m2
- Total floor area 145.30 m2
- Number of floors 2floors
- Structure light weight wood frame system
- Architect in charged Won Youmin, Jo Janghee
- Schematic design Shin Chaeyeon
- Drawing development Shin Chaeyeon
- Interior design Shin Chaeyeon
- Technical drawing Shin Chaeyeon
- Supervision Won Youmin
- Photographer Hwang Hyochel
- m.e.p engineering Jungyeon
- Construction 원빌더